Research Catalog

Investment time scheduling in urban reconstruction; a quantitative study of the reconstruction of Rotterdam.

Title
Investment time scheduling in urban reconstruction; a quantitative study of the reconstruction of Rotterdam.
Author
Burns, Leland Smith.
Publication
's-Gravenhage [1961?]

Items in the Library & Off-site

Filter by

1 Item

StatusFormatAccessCall NumberItem Location
TextUse in library E-12 4110Schwarzman Building - General Research Room 315

Details

Description
151 p. plates, maps, diagrs., tables.; 24 cm.
Subjects
Note
  • "Stellingen": [2] p. inserted.
Thesis (note)
  • Proefschrift--Nederlandsche Economische Hoogeschool te Rotterdam.
Bibliography (note)
  • Bibliography: p. 148-151.
Call Number
E-12 4110
LCCN
64036187
OCLC
8262110
Author
Burns, Leland Smith.
Title
Investment time scheduling in urban reconstruction; a quantitative study of the reconstruction of Rotterdam.
Imprint
's-Gravenhage [1961?]
Thesis
Proefschrift--Nederlandsche Economische Hoogeschool te Rotterdam.
Bibliography
Bibliography: p. 148-151.
Research Call Number
E-12 4110
View in Legacy Catalog