Research Catalog
Investigation of construction and maintenance of airdromes on ice, 1949-1950 : report of landings on ice for Project Resupply 1950, Resolute Bay phase
- Title
- Investigation of construction and maintenance of airdromes on ice, 1949-1950 : report of landings on ice for Project Resupply 1950, Resolute Bay phase / prepared by Soils, Foundation and Frost Effects Laboratory, Corps of Engineers, U.S. Army, New England Division, Boston, Mass. ; for Office of the Chief of Engineers, Airfields Branch, Engineering Division, Military Construction.
- Author
- United States. Army. Corps of Engineers. New England Division Soils, Foundation and Frost Effects Laboratory.
- Publication
- Boston : The Laboratory, 1950.
Items in the Library & Off-site
Filter by
1 Item
Status | Format | Access | Call Number | Item Location |
---|---|---|---|---|
Text | Request in advance | VDY (United States. Soils, Foundation and Frost Effects Laboratory, Boston. Report of landings on ice for Project Resupply) | Offsite |
Details
- Description
- h, 43, [4] p., 51 leaves of plates : ill., maps; 27 cm.
- Series Statement
- [Technical report - Arctic Construction and Frost Effects Laboratory ; 30]
- Arctic Construction and Frost Effects Laboratory (U.S.). Technical report ; 30.
- Alternative Title
- Report of landings on ice for Project Resupply 1950, Resolute Bay phase.
- Subject
- Note
- At head of title: Corps of Engineers, U.S. Army.
- Bibliography (note)
- Includes bibliographical references.
- Call Number
- VDY (United States. Soils, Foundation and Frost Effects Laboratory, Boston. Report of landings on ice for Project Resupply)
- OCLC
- 6004243
- Author
- United States. Army. Corps of Engineers. New England Division Soils, Foundation and Frost Effects Laboratory.
- Title
- Investigation of construction and maintenance of airdromes on ice, 1949-1950 : report of landings on ice for Project Resupply 1950, Resolute Bay phase / prepared by Soils, Foundation and Frost Effects Laboratory, Corps of Engineers, U.S. Army, New England Division, Boston, Mass. ; for Office of the Chief of Engineers, Airfields Branch, Engineering Division, Military Construction.
- Imprint
- Boston : The Laboratory, 1950.
- Series
- [Technical report - Arctic Construction and Frost Effects Laboratory ; 30]Arctic Construction and Frost Effects Laboratory (U.S.). Technical report ; 30.
- Bibliography
- Includes bibliographical references.
- Added Author
- United States. Army. Corps of Engineers.
- Added Title
- Report of landings on ice for Project Resupply 1950, Resolute Bay phase.
- Research Call Number
- VDY (United States. Soils, Foundation and Frost Effects Laboratory, Boston. Report of landings on ice for Project Resupply)