Research Catalog

Design for improved submarine tunnel, comprising brick arch within cast or wrought iron skin, laid in trench dredged for that purpose [first proposed in 1868 for crossing Boston Harbor]

Title
Design for improved submarine tunnel, comprising brick arch within cast or wrought iron skin, laid in trench dredged for that purpose [first proposed in 1868 for crossing Boston Harbor] [microform].
Publication
Washington, DC : [s.n.], 1872.

Details

Additional Authors
  • Foster, J. G., (Bvt. Maj. Gen.)
  • United States. Army. Corps of Engineers.
Description
8 p. : ill.; cm.
Uniform Title
US Executive Branch Documents, 1789-1909 ; no. W702-62
Subject
  • Tunnels > Design and construction
  • Engineering drawings > Design and construction
Note
  • Reuse of record except for individual research requires license from Congressional Information Services, Inc.
Indexed In (note)
  • CIS Index to U. S. Executive Branch Documents, 1789-1909, Part 2.
Reproduction (note)
  • Microfiche.
Call Number
CIS *XLF-373 US Exec MF W702-62
OCLC
cis19020403
Title
Design for improved submarine tunnel, comprising brick arch within cast or wrought iron skin, laid in trench dredged for that purpose [first proposed in 1868 for crossing Boston Harbor] [microform].
Imprint
Washington, DC : [s.n.], 1872.
Series
US Executive Branch Documents, 1789-1909 ; no. W702-62
Indexed In:
CIS Index to U. S. Executive Branch Documents, 1789-1909, Part 2.
Reproduction
Microfiche. [Bethesda, Md.] : Congressional Information Service, 1991. 11 x 15 cm. (CIS US Executive Branch Documents, 1789-1909 : no. W702-62)
Added Author
Foster, J. G., (Bvt. Maj. Gen.)
United States. Army. Corps of Engineers.
Sudoc No.
W 7.2:Su 1.
Research Call Number
CIS *XLF-373 US Exec MF W702-62
View in Legacy Catalog