Research Catalog

Evaluation of the effectiveness of the weighted guidelines to induce contractor's investment in cost reducing facilities equipment

Title
Evaluation of the effectiveness of the weighted guidelines to induce contractor's investment in cost reducing facilities equipment / prepared by Analytics ; prepared for Defense Systems Management College.
Publication
Fort Belvoir, Va. : The College, [1985].

Items in the Library & Off-site

Filter by

1 Item

StatusFormatAccessCall NumberItem Location
TextUse in library JBF 11-61Schwarzman Building - General Research Room 315

Details

Additional Authors
  • Analytics (Firm)
  • Defense Systems Management College.
Description
1 v. (various pagings) : ill., 1 form; 28 cm.
Subject
Defense contracts > United States
Note
  • Cover title: Evaluation of the effectiveness of the weighted guidelines to include contractor's investment in cost reducing facilities equipment.
  • "October 1984."
Bibliography (note)
  • Includes bibliographical references.
Type of Report (note)
  • Final.
Funding (note)
  • Defense Systems Mgmt College.
Call Number
JBF 11-61
OCLC
11791411
Title
Evaluation of the effectiveness of the weighted guidelines to induce contractor's investment in cost reducing facilities equipment / prepared by Analytics ; prepared for Defense Systems Management College.
Imprint
Fort Belvoir, Va. : The College, [1985].
Type Of Report
Final. 4/83 to 8/84.
Bibliography
Includes bibliographical references.
Funding
Defense Systems Mgmt College. MDA903-82-G-0053.
Added Author
Analytics (Firm)
Defense Systems Management College.
Gpo Item No.
306-A
Sudoc No.
D 1.6/2:Ev 1
Research Call Number
JBF 11-61
View in Legacy Catalog