Research Catalog
Revised draft supplemental generic environmental impact statement on the Oil, Gas and Solution Mining Regulatory Program : well permit issuance for horizontal drilling and high-volume hydraulic fracturing to develop the Marcellus Shale and other low-permeability gas reservoirs
- Title
- Revised draft supplemental generic environmental impact statement on the Oil, Gas and Solution Mining Regulatory Program : well permit issuance for horizontal drilling and high-volume hydraulic fracturing to develop the Marcellus Shale and other low-permeability gas reservoirs / prepared by NYSDEC, with assistance from Alpha Environmental, Inc., Ecology Environment Engineering, P.C., ICF International, URS Corp., NTC Consultants and Sammon/Dutton LLC.
- Publication
- [Albany, N.Y.] : New York State, Dept. of Environmental Conservation, Division of Mineral Resources, [2011] +
Items in the Library & Off-site
Filter by
2 Items
Status | Format | Access | Call Number | Item Location |
---|---|---|---|---|
Available - Can be used on site. Please visit New York Public Library - Schwarzman Building to submit a request in person. | Text | Use in library | JBF 15-289 | Schwarzman Building - General Research Room 315 |
Text | Request in advance | *WSC-8229 | Offsite |
Details
- Additional Authors
- Description
- 1 volume (various pagings) : illustrations, maps; 30 cm
- Alternative Title
- Revised draft SGEIS on the Oil, Gas and Solution Mining Regulatory Program
- Oil, Gas and Solution Mining Regulatory Program
- Well permit issuance for horizontal drilling and high-volume hydraulic fracturing to develop the Marcellus Shale and other low-permeability gas reservoirs
- Revised draft SGEIS 2011
- SGEIS for high-volume hydraulic fracturing in the Marcellus Shale, September 2011.
- Economic assessment report for the Supplemental Generic Environmental Statement on New York State's Oil, Gas and Solution Mining Regulatory Program (August 2011).
- Subject
- New York (State). Bureau of Oil and Gas Regulation > Regulations
- Gas well drilling > Environmental aspects > New York (State)
- Hydraulic fracturing > Environmental aspects > New York (State)
- Environmental impact statements > New York (State)
- Administrative regulation drafting > New York (State)
- Petroleum industry and trade > New York (State) > Regulations
- Solution mining > New York (State) > Regulations
- Natural gas > New York (State) > Regulations
- Marcellus Shale
- Note
- "Date of Completion of Revised dSGEIS: September 7, 2011."
- "DEC received more than 13,000 public comments on the Draft Supplemental Generic Environmental Impact Statement (SGEIS) issued in September 2009. The Draft SGEIS addresses permit conditions required for gas drilling in Marcellus Shale and other areas of the State. In response to issues raised, DEC has prepared a Revised Draft SGEIS. As of September 7, the document is available for public review. To help those interested in understanding the issues involving horizontal drilling and high-volume hydraulic fracturing, several fact sheets are also available." -- from Dept. of Environmental Conservation website.
- "SGEIS for high-volume hydraulic fracturing in the Marcellus Shale, September 2011"--Disc surface.
- CD-ROM contains 2 PDF files: Economic assessment report for the Supplemental Generic Environmental Statement on New York State's Oil, Gas and Solution Mining Regulatory Program (August 2011) (251 p.), prepared for NYSDEC by Ecology and Enviroment Inc. ; Revised draft Supplemental Generic Environmental Impact Statement on the Oil, Gas and Solution Mining Regulatory Program well permit issuance for horizontal drilling and high-volume hydraulic fracturing to develop the Marcellus Shale and other low-permeability gas reservoirs (September, 2011) (1537 p.), prepared by NYDEC, with assistance from Alpha Environmental, Inc., Ecology and Environmental Engineering, P.C., ICF International, URS Corp., NTC Consultants and Sammons/Dutton LLC.
- Bibliography (note)
- Includes bibliographical references.
- Contents
- Executive Summary -- 1. Introduction -- 2. Description of proposed action -- 3. Proposed SEQRA review process -- 4. Geology -- 5. Natural gas development activities and high-volume hydraulic fracturing -- 6. Potential environmental impacts -- 7. Mitigation measures -- 8. Permit process and regulatory coordination -- 9. Alternative actions -- 10. Review of selected non-routine incidents in Pennsylvania -- 11. Summary of potential impacts and mitigation measures -- Glossary -- SGEIS bibliographies -- Consultants' bibliographies -- Appendices 1 through 27 -- Radiation guide -- Economic assessment report.
- Call Number
- JBF 15-289
- OCLC
- 910632955
- Title
- Revised draft supplemental generic environmental impact statement on the Oil, Gas and Solution Mining Regulatory Program : well permit issuance for horizontal drilling and high-volume hydraulic fracturing to develop the Marcellus Shale and other low-permeability gas reservoirs / prepared by NYSDEC, with assistance from Alpha Environmental, Inc., Ecology Environment Engineering, P.C., ICF International, URS Corp., NTC Consultants and Sammon/Dutton LLC.
- Imprint
- [Albany, N.Y.] : New York State, Dept. of Environmental Conservation, Division of Mineral Resources, [2011] + CD-ROM (4 3/4 in.)
- Type of Content
- text
- Type of Medium
- unmediated
- Type of Carrier
- volume
- Bibliography
- Includes bibliographical references.
- Added Author
- New York (State). Division of Mineral Resources.New York (State). Department of Environmental Conservation.Alpha Environmental, Inc.Ecology and Environment, Inc.ICF International (Firm)URS Corporation.NTC Consultants.Sammons Dutton LLC.
- Running Title
- Revised draft SGEIS 2011
- Added Title
- SGEIS for high-volume hydraulic fracturing in the Marcellus Shale, September 2011.Economic assessment report for the Supplemental Generic Environmental Statement on New York State's Oil, Gas and Solution Mining Regulatory Program (August 2011).
- Research Call Number
- JBF 15-289*WSC-8229 [CD-ROM]