Research Catalog
Projections of cost, duration, and on-site manual labor requirements for constructing electric generating plants, 1979-83.
- Title
- Projections of cost, duration, and on-site manual labor requirements for constructing electric generating plants, 1979-83.
- Publication
- [Washington, D.C.?] : U.S. Dept. of Labor : U.S. Dept. of Energy, 1979.
Items in the Library & Off-site
Filter by
1 Item
Status | Format | Access | Call Number | Item Location |
---|---|---|---|---|
Not available - Please for assistance. | Text | Use in library | HD5718.B92 U484 1979 | Off-site |
Details
- Additional Authors
- Description
- v, 103 p. : ill.; 28 cm.
- Subjects
- Note
- "Construction labor demand system."
- "September 1979."
- "DOE/IR-0057."
- "DOL/CLDS/PP2."
- Bibliography (note)
- Bibliography: p. 100-103.
- Owning Institutions
- Princeton University Library