Research Catalog

Projections of cost, duration, and on-site manual labor requirements for constructing electric generating plants, 1979-83.

Title
Projections of cost, duration, and on-site manual labor requirements for constructing electric generating plants, 1979-83.
Publication
[Washington, D.C.?] : U.S. Dept. of Labor : U.S. Dept. of Energy, 1979.

Items in the Library & Off-site

Filter by

1 Item

StatusFormatAccessCall NumberItem Location
TextUse in library HD5718.B92 U484 1979Off-site

Details

Additional Authors
  • United States. Dept. of Energy.
  • United States. Dept. of Labor.
Description
v, 103 p. : ill.; 28 cm.
Subjects
Note
  • "Construction labor demand system."
  • "September 1979."
  • "DOE/IR-0057."
  • "DOL/CLDS/PP2."
Bibliography (note)
  • Bibliography: p. 100-103.
Owning Institutions
Princeton University Library